Full Project – IMPACT OF MATERIALS MANAGEMENT IN THE PRODUCTIVITY OF AN ORGANIZATION

Full Project – IMPACT OF MATERIALS MANAGEMENT IN THE PRODUCTIVITY OF AN ORGANIZATION

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

 1.1  Background of the Study

Due to sophistication in technology coupled with socio-economic and political instability, production processes face complex problems that needs to be addressed by management ensuring that materials are allocated and used in the most efficient and effective manner. The material management technique on production is also to identify problems by guiding against sub-optimization of the material management techniques in production planning processes, for this the researcher suggests that which will achieve optimal result quickly, cheaper and acceptable. Today materials are the live wire of every organization be it public or private, hence no organization can survive without material, its availability, distribution and transportation and delivery at the right amount and quality is paramount.

1.2   Statement of the Problem

Organizations are faced with problems in relation to utilization of the effect of material management being the utmost thing that are needed to be utilized effectively. The problem facing material management are mainly under stocking or over stoking of material, stock obsolescence breakage and the economic order quantity. Due to the fact that the impact is to be felt positively in the society by making themselves’ productive in every area of inputs. But despite the effect observed there have been general apathy, ignorance and lack of interest by many people and the government.

1.3   Objectives of the Study

The main objective of this study is to determine the effect of compensation management on employee performance. Specific objectives include:

i. To assess the impact of material management on organizational performance.

ii. To appraise and further appreciate the significance of material management in a manufacturing industry.

iii. To identify and ascertain some of the problems posed by materials management.

1.4 Research Questions

i. What is the impact of material management on productivity?

ii. What is the impact productivity on organizational development?

iii. What are some of the problems posed by materials management?

1.5 Research Hypotheses

Hypothesis I

H0: Material management does not have any significant impact on organizational performance.

Hi: Material management does have significant impact on organizational performance.

Hypothesis II

H0: Material management does not have significant impact on manufacturing industry.

Hi: Material management does have significant impact on manufacturing industry.

Hypothesis III

H0: Material management does not pose a problem to productivity.

Hi: Material management does pose a problem to productivity.

1.6 Significance of the Study

This study will be of immense benefit to other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.

1.7 Scope of the Study

This study is on the impact of materials management to gather necessary information and suggest solution to the problem facing productivity in organizations.

1.8 Limitations of the study

The demanding schedule of respondents made it very difficult getting the respondents to participate in the survey. As a result, retrieving copies of questionnaires in timely fashion was very challenging. Also, the researcher is a student and therefore has limited time as well as resources in covering extensive literature available in conducting this research. Information provided by the researcher may not hold true for all research under this study but is restricted to the selected respondents used as a study in this research especially in the locality where this study is being conducted. Finally, the researcher is restricted only to the evidence provided by the participants in the research and therefore cannot determine the reliability and accuracy of the information provided. Other limitations include;

Financial constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint: The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

1.9 Definition of Terms

· Material Management: This is defined as the grouping under one head all or some of the activities involved in the organization and use of materials employed from the need stage up to the storage of finished goods.

· Purchasing: Purchasing is defined as the activity directed to securing by legal means, the materials suppliers and equipment required in the operation of an enterprise.

· Sourcing:  This is referred to the investigation and evaluation of sources of supply and suppliers.

· Negotiation: Is a process of planning, receiving and analyzing conditions by both buyer and seller to arrive at an acceptable agreement through mutual understanding.

· Expediting: It is a process of ensuring that goods are promptly delivered to the right place and at the right time.

· Purchasing Requisition: It is a form usually prepared when a department or stores need materials to be purchased.

· Issue: Issue is the withdrawal of goods and handover of stock to user backed with authorized documents.

· Organization: Are artificially contrived structure with procedures and objectives defining the responsibilities, who does what type of job task, who report to whom and when and who is responsible for what action.

. Quality Control: Is a process whereby goods and services are examined to ensure that they conform to predetermined standards.

. Obsolescence: These are materials for which there is no demand either because of the presence of a better substitute or they are out of use or fashion.

· Stocktaking: This is the complete process of verifying the quality balance of the entire stock hold in the store.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour
  31. Other Projects
  32. Political Science
  33. Psychology
  34. Public Administration
  35. Public Health Research Project
  36. More Research Project
  37. Transportation Management
  38. Nursing

Education

 

Full Project – IMPACT OF MATERIALS MANAGEMENT IN THE PRODUCTIVITY OF AN ORGANIZATION


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://azresearchconsult.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://azresearchconsult.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://azresearchconsult.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://azresearchconsult.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend azresearchconsult.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!