Full Project – Government policies and its effects on building project implementation in Nigeria

Full Project – Government policies and its effects on building project implementation in Nigeria

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

1.0  INTRODUCTION

1.1  Background of Study

Government has embarked upon a numbers of specific policies in the past which was aimed at enhancing the implementation of projects which the research cover a number of economic policies such tax reform liberalization policies deregulation policy, new housing found, national housing policy, national building code, structural adjustment programme and it will narrowed down to building industry. As a result of the unique nature of the building industry etc furthermore the decrees established by professional bodies such as Architect Council of Nigeria, (ARCON) and the Council of registered builders of Nigeria (CORBON).

Basically in the construction industry in Nigeria, the records of many abandoned project were as a result of changes in government policies national housing fund policy. According to Abumers S. (1997) assert that concept of national housing fund as proposed in the national housing policies is to ensure a continuous flow of long-term founding for housing development and to provide affordable loans for low income housing.

According to Mazue (1992) assets that the failure of the past building delivery systems has been due to lack of adequate monitoring and evaluation of policy implementation. He stressed that transition from one government to another also affect its implementation. Adewale I. (1987) opined that Nigeria enactment of building agencies has not done the construction industry any good. The research being that many of these code fails because of their inability to reflect out traditional construction requirement.

 

1.2  The Statement of Problem/the Need for the Study

The positive impact of the policies made by government and affect in project implementation is not felt by Imo State citizen in particular and Nigeria in general. The services provides by the government which are based on the policies and decisions of policy makers are not adequate.

Professionals like quantity surveyors is not doubtful of his construction cost and inherent in flationnor trend this has paved way the quacks to thrive in the industry and client are now expressing fear that professional will give them high cost on project. It has affected employment in the nation.

Generally, it has resulted to high cost of rent and properties hence, the standard of living of the majority of people has been affected.

 

1.3  Aim of the Study

This research work is aimed at access government policy and its affect on building project implementation in Nigeria using Imo State as a case study.

 

1.4  Objective of the Study

  • To identify several government policies in the country and its effects on building project implementation.
  • The review and analysis several policies that have been enforce in the country.
  • To identify their sectional allocation to the building sector.
  • To identified the weakness of these policies as well as their contribution towards effective project implementation in the country and make recommendation where necessary.
  • To identify the factors militating against access the government policy and effect in building project implementation in Imo State.
  • To identified the ultimate requirement for any effect in project implementation and the used for minimizing cost of abandoned project in the country.

 

1.5  Significance of the Study

The researcher through this report hope to online the effect of government policies and to advice government to adopt policies which has a genuine intention of developing the country policy which will not lead to abandonment of building project and reduce the cause of building collapse, policies which will not encourage the looting of the national treasury by government officials, when this good policies are limited, it will help reduce the cost of living and hence better the lot of the masses the building contractor will equally appreciate his profession.

1.6  Research Question

  1. What is the need of government policies in the country and its effect on building project implementation?
  2. What are the review and analysis of policies that have been enforce the country?
  • What is sectional allocation to the building sector?
  1. What are the weakness of these policies and contribution towards effective project implementation in the country?
  2. Is there any factors militating against access the government policy and effect in building project implementation in Imo State?
  3. What is the ultimate requirement for any effect in project implementation, the used for minimizing cost of abandoned project in the country?

 

 

 

1.7  Scope and Delimitation

Policies implementation, it covers a number of economic and it refers other process of converting financial, building material, technical and human input into output goods and services.

However one of dominate and unique issue in local government administration and political system is the efficient and effective provision of basic amenities and social infrastructure provision of projects one key to the very existence local governments.

They are required to serve the public interest in areas of building feeder roads construction of matels health care centers, drainage others while these functions of local government are well known and popularized by the construction of the country. It is against these backgrounds that paper examines these issues and how they affect project initiation, implementation, monitoring and evaluation.

 

 

 

 

 

 

1.8  LIMITATION

This researcher had in mind to present this work in such a way that it will be captivating to whosoever that comes in contact with its content at first sight but time constraints and difficulty in gathering and arranging information, were some of the limitation.

Information and materials from ministry of works and housing, federal office of statistics, library and interview conducted in some construction firms were used in putting up this work. Nevertheless, the researcher hope that you will find this project not only interesting but useful how in future.

 

1.9  Definition of Key Terms

  1. It is a statement declaration of a government political activities, plans and intentions relating to a concrete causes or at the assumption of office an entire legislative session. It certain countries they are announced by the head of government or a minister of the parliament.
  2. What is policy? Is a principle of behavior conduct etc though to be desirable or necessary, especially as formally expressed by a government or other authoritative body.
  • What is Implementation? Is the process of moving an idea from concept to reality. In business, engineering and other field; implementation refers to the building process rather than the design process.
  1. Deregulation? Is the process of removing or reducing state regulations typically in the economic sphere: it is the undomy or repeal of government regulation of the economy.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

See Other Essay Here

 

 

Full Project – Government policies and its effects on building project implementation in Nigeria


RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | Https://azresearchconsult.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
Simply click on the Download button above and follow the procedure stated.
I have a fresh topic that is not on your website. How do I go about it?
Chat with us on WhatsApp or contact our Instant Help Desk for a custom research project on your topic.
How fast can I get this complete project on any project topic?
Within 15 minutes if you want this exact project topic without adjustment.
Is it a complete research project or just materials?
It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data.
What if I want to change the case study for this topic?
Chat with Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
How will I get my complete project?
Your Complete Project Material will be sent to your Email Address in Ms Word document format.
Can I get my Complete Project through WhatsApp?
Yes! We can send your Complete Research Project to your WhatsApp Number.
What if my Project Supervisor made some changes to a topic I picked from your website?
Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
Do you assist students with Assignment and Project Proposal?
Yes! Call Our Instant Help Desk Now: +234 708 7083 227 and you will be responded to immediately.
What if I do not have any project topic idea at all?
Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 708 7083 227.
How can I trust this site?
We are genuine and duly registered with the Corporate Affairs Commission. This site runs on Secure Sockets Layer (SSL), ensuring all transactions are highly secure and safe.
Customer Testimonials | Https://azresearchconsult.com

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://azresearchconsult.com delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://azresearchconsult.com is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend azresearchconsult.com to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!