Full Project – Design and implementation of computerised stock control system

Full Project – Design and implementation of computerised stock control system

Click here to Get this Complete Project Chapter 1-5

CHAPTER ONE

INTRODUCTION

  • INTRODUCTION

A stock management system contains a list of orders to be filled and then prompts workers to pick the necessary items, and provides them with packaging and shipping information. Stock control may be used to automate sales order fulfillment process and also manage in and outward material of hardware. Automation is the replacement of human workers by technology. For optimal sales and inventory management process, robust functionality is needed for managing logistics facilities. Warehouse management functions for inventory control cover internal warehouse movements and storage and its support helps in the recording and tracking of materials on basis of both quantity and value. This application takes care of all supply orders reducing cost for warehousing, transportation while improving customer service. It significantly improves inventory turns, optimizes flow of goods. It also improves cash flow, visibility and decision making providing efficient execution of tasks using this fast and reliable computerized method.

  • BACKGROUND OF THE STUDY

The Intel Nigeria was established in the year 1996. It aims at providing various logistics services to its customers through the distribution and sales of quality products etc. It is second to none and for this reason, the demand is high and the company responds to the increasing demand by stabilizing supply to strike a balance. Justifiably, the company has the problem of keeping adequate record of goods transfer and since it is done manually, associated problems of insecurity, high cost of operation and delay in supply arise. Data processing in the firm is presently carried out using people, pens, and paper to control stock and inventory. The design and development of information management system for Intel Nigeria   will no doubt bring immeasurable relief from the problems associated with the manual.

  • STATEMENT OF THE PROBLEMS

The firm   is to an extent manually operated and reveals a number of problems.

  1. The recording of sales and cash received are done manually on a book that appears rough. Thus, the books are exposed to physical damage, information can be lost and dust particles are accumulated.
  2. The long list of supply orders waiting to be attended to on daily basis.
  • The control system is time consuming, less accurate and less efficient, and the environment is not user friendly.
  1. Inaccuracies often ensue from human error.

 

The manual system is quite tedious and can be reduced or eliminated with the introduction of the proposed system

  • AIM AND OBJECTIVES OF THE STUDY

The main aim of this study is to develop a computerized stock control and management system which has the following objectives:

  1. It provides total asset visibility.
  2. It allows reduced inventory stocking levels giving full inventory history.
  • It reduces lead time, shelf space, and errors due to damage, fatigue of staff and overall cost of operations.
  1. It facilitates “just in time” deliveries.
  2. It provides full process control for products.
  3. It provides higher level security as the system would be password to prevent unauthorized access.
  • It helps the management plan, monitor, optimize resources and ascertain their financial position at any time.

 

 

  • SIGNIFICANCE OF THE STUDY

This study is primarily aimed at increasing efficiency in operations, reducing maintenance and running cost, monitoring the supply of farm produce effectively and its distribution and increase profit to the organization by introducing an automated stock management system.

  • SCOPE OF THE STUDY

The scope of this study covers the inventory and stock for Intel Nigeriaas a whole, and its customers which include retailers, distributors and the general

  • LIMITATION OF THE STUDY

This project was constrained by the following factors:

(a) Financial Constraints

Bearing in mind the economic state of the nation, it was found difficult in making both ends meet, because of the exorbitant nature of things nowadays in travelling for the collection of data needed for the project.

(b) Time Constraints

Looking at the interval between the resumption and vacation of the final semester for the project to be completed, the time given seemed to be short for the collection of required information for better work to be done.

1.7 DEFINITIONS OF TERMS

Automation: This is the use of technology or computers to control and process data reducing the need for human intervention.

Computerization: This is the conversion of a manually operated system to a controlled, organized and automated system.

Database: This refers to a large store of related data on a computer that a user can access and modify.

Information System: A collection of procedures, people, instructions and equipment to produce information in a useful form.

Inventory Control System: A list of orders to be filled, and prompts workers to pick the necessary items and provides them with packaging and shipping information.

Password: This is a secret code that must be entered into a computer to enable access to its applications. It is made up of numbers, letters, special characters or a combination of any of the above categories.

Processing: This is dealing with something according to an established procedure.

Research: A careful study of a subject to discover facts, establish a theory or develop a plan of action based on the facts discovered.

Software: A computer program or set of instructions that direct a computer to perform processing functions.

System: A set of computer components functioning together.

Technology: The study of techniques of mobilizing resources such as information for accomplishing objectives that benefit man and his environment.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

Essay 

 

 

Full Project – Design and implementation of computerised stock control system